← Content Plan
Dry Hire

Event Equipment Dry Hire Checklist: What to Confirm Before Delivery

A practical, phase-by-phase checklist covering everything that needs to be confirmed between enquiry and event day for a dry hire booking to go smoothly.

event dry hire checklist

In this article

  1. Phase 1: Pre-booking
  2. Phase 2: At booking
  3. Phase 3: Pre-event (48 hours out)
  4. Phase 4: Collection or delivery day
  5. Phase 5: On site
  6. Phase 6: Return
01

Phase 1: Pre-booking

Before you enquire

These items should be resolved before you contact any hire company. If these are not answered, the hire company cannot quote accurately and you cannot confirm whether the booking is viable.

02

Phase 2: At booking

When confirming the hire

These points should be confirmed in writing as part of the booking process, not assumed from the quote.

03

Phase 3: Pre-event (48 hours out)

48 hours before collection or delivery

This is the window to catch anything that has slipped through. Problems found here can still be solved. Problems found on load-in morning often cannot.

04

Phase 4: Collection or delivery day

At the warehouse or on delivery
05

Phase 5: On site

Load-in through show
06

Phase 6: Return

De-rig through return
07

Related reading

Ready to build your dry hire kit list?

Talk to us about your event. We will work through the specification with you, confirm availability and make sure nothing is missing before you confirm.

Get in Touch
🔒 Confidential